India's energy agenda is coherent in a ministerial meeting. Its fuel prices tell a different story.
In brief
India generates 71% of its electricity from coal, and most of its gas is imported and expensive. That cost structure decides which parts of its energy agenda make sense. New gas plants are unlikely to provide much of the grid flexibility India needs. Its existing 20 GW gas fleet already runs at about 14.5% of capacity, and batteries, pumped hydro and more flexible coal plants are cheaper. Biomethane is the strongest case, because it is domestic and avoids import price exposure. It is worth more as vehicle and household fuel than as power plant fuel. Green hydrogen belongs in fertilizer and refining, not power generation. For most Indian data centers, onsite power is a question of backup and renewable supply rather than speed to connection. Mumbai's local grid is the exception to watch.
Introduction
Earlier this month I joined a UK trade delegation to India. It was organized around the UK-India Comprehensive Economic and Trade Agreement (CETA) and the Joint Economic and Trade Committee (JETCO), the standing forum the two governments use to manage trade between them. Four energy themes came up repeatedly: flexible generation to support the grid, biogas upgrading, hydrogen, and power for a fast-growing data center sector.
Each is reasonable on its own, but together they assume something India's power system does not provide: a market where gas-based options are priced to compete. India runs on cheap domestic coal, most of its gas is imported and expensive. That one fact sorts the four themes more sharply than any policy statement.
The current electricity system in India
Coal provided 71% of India's electricity in 2025, against a global average of 33%. Clean sources supplied 27%, with solar the largest at 9.4%. In 2025, a year of weak demand growth, coal generation fell 2.9% and all new demand was met by clean sources.
That is a real shift, but not yet a trend. India had 44 GW of new coal capacity under construction as of March 2026, according to the Central Electricity Authority (CEA), the government's technical power planner.
Coal's dominance is why Indian power is cheap, and the grid is more reliable than its reputation suggests. Gas has the opposite problem. India's gas-fired plants were largely built on the expectation of rising domestic gas output that did not arrive. In the year to March 2025, the fleet ran at an average of 14.5% of its capacity. About 5 GW that had sat idle for years was retired as inoperable, cutting the fleet from 25.2 GW to 20.1 GW. These plants exist and are connected but they still cannot sell power at a price buyers will pay.
Who pays and for what type of flexibility?
The question on the visit was which technologies India needs. The better question is which ones India can afford to run, and who pays for flexibility once it is built?
India's flexibility problem comes from solar, not coal. Solar output peaks at midday and falls to zero in the early evening, just as cooling demand peaks. Demand reached a record 270.8 GW on May 21, 2026. The following evening, Grid-India, the national grid operator, reported a late-evening shortfall of about 2.57 GW. The shortage is real, but it sits in a few hours of the day.
This is where I find the Temporal Trilemma useful. The energy trilemma balances security, affordability and sustainability, but it has no time axis. India sits at a different point on that axis than the US or UK. It is adding renewables quickly to a system whose firm capacity is coal, which already exists and is largely paid for. The useful question is not what the ideal end state looks like. It is which resource fills the evening gap at the lowest cost over the next decade.
Flexibility: the case for gas, and the challenge with it
The case for gas-fired flexible generation is a fair one. Gas engines and turbines start quickly, follow load, and do not run out of charge after four hours. Analysts have argued that India's idle gas fleet could serve evening peaks while battery storage matures. If liquefied natural gas (LNG) settles near $6 per million British thermal units, gas becomes more competitive than at any point in a decade, as a system balancer rather than a baseload fuel.
I accept the logic. The difficulty is the evidence. India already has about 20 GW of gas capacity able to do this job, and it runs at roughly one-seventh of its capacity. If the existing fleet cannot find buyers at current fuel prices, new capacity has to be justified on something other than technical capability. India is not short of gas flexibility. It is short of affordable gas.
The alternatives are moving fast. Operational battery storage reached 8.5 GWh in the first half of 2026, an elevenfold rise in a year, according to the India Energy Storage Alliance. Battery auction tariffs fell by more than 65% between 2022 and 2024. New solar tenders must include two hours of co-located storage equal to 10% of the solar capacity. The Solar Energy Corporation of India (SECI) now runs "assured peak" tenders that pay only for delivery outside solar hours. India also has 7.43 GW of pumped hydro storage in operation.
Coal will flex as well. Ember projects that as renewables grow, coal moves from baseload to balancing, and its generation cost rises by about 25% by fiscal 2032 as plants run less and cycle more. That is the cost of flexibility in plain form. It will be paid, but mostly through batteries, pumped hydro and existing coal plants, not new gas.
Gas still has a place. It can insure against multi-day periods of low wind and solar output that batteries cannot cover, and it can support specific locations where the network is weak. That is a narrower market than the conversation on the visit implied, and in it the fuel decides more than the engine.
Biomethane: the import-proof gas
This is the strongest of the four themes because it deals with the fuel problem directly. Biomethane is biogas cleaned and upgraded to close to natural gas quality. Made from crop residue, cattle dung, sugar mill press mud and municipal waste, it is domestic, and it carries no exposure to LNG prices.
The policy pull is real. India's Compressed Biogas Blending Obligation requires city gas distributors to blend compressed biogas (CBG) into compressed natural gas (CNG) for vehicles and piped natural gas (PNG) for homes. The obligation is 1% in 2025-26, 3% in 2026-27 and 4% in 2027-28, rising to 5% from 2028-29. The government expects it to support around 750 projects.
Delivery has lagged ambition. The Sustainable Alternative Towards Affordable Transportation (SATAT) program, launched in 2018, originally targeted 5,000 plants. By early 2026, 132 plants had been commissioned, producing about 920 tonnes a day. The supply chain is maturing, though. One encouraging signal from the visit was that upgrading equipment is now being assembled in India, for domestic projects and for export.
The point worth drawing out is where the gas goes. The mandate directs biomethane to transport and household fuel, where it displaces imported gas at retail value. Burned for power, it competes with coal at wholesale value. On current economics, India's biomethane is worth more in a vehicle or a kitchen than in a power plant. Power generation makes sense where the gas is made and used on the same site, such as a dairy, a sugar mill or a wastewater plant, and where the digestate has value as fertilizer.
Hydrogen: right molecule, wrong use
India already uses around 6 million tonnes of hydrogen a year, almost all of it made from fossil fuels and consumed mainly in fertilizer production and oil refining. That is where green hydrogen, made by splitting water with renewable electricity, belongs.
The National Green Hydrogen Mission targets 5 million tonnes a year of production capacity by 2030. By February 2026, about 8,000 tonnes a year had been commissioned. Recent tenders to supply state-owned refineries cleared at INR 387 to 397 per kg.
At those prices, green hydrogen is a premium industrial feedstock. Burning it for power in a market anchored by coal makes little sense, and it would divert a scarce product from the uses that need it most. Encouraging the hydrogen sector is sound. Encouraging hydrogen-fired power is not, at least this decade. It is an option that is real but not yet exercisable.
Data centers: why the US argument does not currently travel
This is where I have to qualify my own work. In the US, much of the case for onsite generation at data centers rests on speed to power. Grid connections take years, so developers build their own supply. India's position is different.
India's operational data center capacity is on track to reach about 2 GW by the end of 2026, with Mumbai accounting for 94% of new supply in the first half of the year. BloombergNEF expects data center electricity demand to rise from 11 terawatt-hours (TWh) in 2025 to 91 TWh in 2035. That is substantial growth, but it lands on a large, coal-backed system that is adding capacity quickly.
Where grid supply is available and cheap, onsite generation is not a question of speed. It becomes a question of backup and procurement: how to secure round-the-clock renewable supply through storage and open access, the arrangement that lets large consumers buy power directly from generators. Onsite gas engines struggle to compete with grid power priced off coal.
The speed-to-power argument may still apply locally. Mumbai's concentration means substation and transmission capacity there could bind before national generation does. That is the indicator I would watch. If connection timelines in Mumbai start to stretch, the US logic arrives. Until then, India's data center power question is about cost and carbon, not time.
Sorting by cost to run
The delegation's four themes are not wrong. They need sorting by what they cost to run, not by how they sound in a ministerial meeting. On that test, biomethane for transport and city gas, and green hydrogen for industry, are the strong cases. Gas-fired flexibility is a narrow insurance market. Onsite power for data centers waits on local grid constraints.
India's flexibility over the next decade will be bought mostly through batteries, pumped hydro and coal plants run more flexibly. Fuel price will decide the mix more than technology preference. For businesses on either side of the trade agreement, that is the starting point for any conversation about India's power market.
Five Nines and Fast Power
Make Better Decisions in AI Energy Investments
References
APA 7th edition. Entries cite the publication consulted; where that is a news report of another body's data, the originating body is noted in brackets.
Bakshi, P. (2026, January 23). A $6 LNG window: Mapping India's long-term gas demand potential. Observer Research Foundation. https://www.orfonline.org/research/a-6-lng-window-mapping-india-s-long-term-gas-demand-potential
Cabinet approves National Green Hydrogen Mission. (2023, January 4). narendramodi.in. https://www.narendramodi.in/cabinet-approves-national-green-hydrogen-mission
Clean energy power generation surges in India but coal remains dominant: Report. (2026, April 21). The Arunachal Times. https://arunachaltimes.in/?p=281502 [Reporting Ember, Global Electricity Review 2026]
Compressed biogas & natural gas blending must from 2025. (2023, November 25). The Tribune. https://www.tribuneindia.com/news/india/compressed-biogas-natural-gas-blending-must-from-2025-565964 [Reporting the National Biofuels Coordination Committee]
Dey, M. (2026, March 26). India commissions 8,000 TPA green hydrogen capacity till Feb 2026, aims for 5 MMT by 2030. Energetica India. https://www.energetica-india.net/news/india-commissions-8000-tpa-green-hydrogen-capacity-till-feb-2026-aims-for-5-mmt-by-2030 [Reporting a Rajya Sabha answer by the Ministry of New and Renewable Energy]
Ember. (n.d.). India [Country profile]. Retrieved October 21, 2026, from https://ember-energy.org/countries-and-regions/india
Impact and Policy Research Institute. (2026). SATAT (Sustainable Alternative Towards Affordable Transportation), 2018: Building India's compressed bioenergy economy. https://www.impriindia.com/?p=76488
India producing 920 TPD biogas with 132 CBG plants: Hardeep Singh Puri. (2026, January). iamrenew. https://www.iamrenew.com/green-energy/india-producing-920-tpd-biogas-with-132-cbg-plants-hardeep-singh-puri/
India shrinks its gas fleet as idle plants become unusable. (2025, May 20). Deccan Herald. https://www.deccanherald.com/amp/story/india%2Findia-shrinks-its-gas-fleet-as-idle-plants-become-unusable-3548996 [Bloomberg report citing Central Electricity Authority data]
India solved solar. Now it has to solve sunset. (2026, July). YourStory. https://yourstory.com/2026/07/india-energy-storage-gap-demand-flexibility-opportunity [Reporting India Energy Storage Alliance and Ministry of Power data]
India's coal expansion beyond 2032 targets "uneconomical", says Ember. (n.d.). Down To Earth. https://www.downtoearth.org.in/amp/story/energy/indias-coal-expansion-beyond-2032-targets-uneconomical-says-ember [Reporting Ember, The Role of Coal in India's Transition]
India's data centre capacity on track to reach 2 GW by end-2026: CBRE. (2026). Digital Terminal. https://digitalterminal.in/trending/indias-data-centre-capacity-on-track-to-reach-2-gw-by-end-2026-cbre [Reporting CBRE South Asia, Beyond Growth: India's Rise Among APAC's Leading Data Centre Markets]
India's data centre capacity quadruples to 1.7 GW, driven by AI and cloud demand. (2026, August 21). Energetica India. https://www.energetica-india.net/news/indias-data-centre-capacity-quadruples-to-17-gw-driven-by-ai-and-cloud-demand [Reporting BloombergNEF]
India's evening power deficit persists despite record solar capacity growth. (2026). MarketScale. https://www.marketscale.com/industries/energy/indias-solar-surge-has-turned-power-shortages-into-an-evening-problem [Reporting Reuters and Grid-India]
Institute for Energy Economics and Financial Analysis. (n.d.). Flexible generation role for India's stressed and stranded gas-based power plants. https://ieefa.org/resources/flexible-generation-role-indias-stressed-and-stranded-gas-based-power-plants
Observer Research Foundation. (2026, April 29). Energy news monitor (Vol. XXII, Issue 38). https://orfonline.org/research/energy-news-monitor-volume-xxii-issue-38 [Reporting Central Electricity Authority data]
Serentica Renewables secures 600 MW in SECI assured peak power tender. (2026, February 6). pv magazine India. https://www.pv-magazine-india.com/2026/02/06/serentica-renewables-secures-600-mw-in-seci-assured-peak-power-tender
State Bank of India. (2026). COE Chakra: Renewables newsletter, solar PV. https://sbi.bank.in/web/coe-chakra/renewables/renewables-newsletters-solar-pvs
World Economic Forum. (2026, June). Why storage is the missing layer in India's clean energy story. https://www.weforum.org/stories/2026/06/storage-india-clean-energy/
Questions and answers
How much of India's electricity comes from coal?
Coal generated 71% of India's electricity in 2025, according to Ember, against a global average of 33%. Clean sources supplied 27%, with solar the largest at 9.4%. Coal generation fell 2.9% in 2025, a year of weak demand growth, but 44 GW of new coal capacity was still under construction in March 2026.
Why are India's gas power plants underused?
Most of India's gas-fired plants were built expecting domestic gas supply that did not arrive. The alternative, imported liquefied natural gas (LNG), makes their power too expensive to compete with coal. In the year to March 2025, the fleet ran at about 14.5% of capacity, and around 5 GW of idle plant was retired.
What is driving India's need for grid flexibility?
Solar power. Solar output peaks at midday and falls to zero in the early evening, just as cooling demand peaks. India's demand reached a record 270.8 GW in May 2026, and the grid operator reported a late-evening shortfall of about 2.57 GW the following day. The gap sits in a few hours each evening.
Will new gas plants provide India's grid flexibility?
Mostly not. India already has about 20 GW of gas capacity that can do this job, and it runs at a fraction of its capacity because the fuel is expensive. Battery storage, pumped hydro and coal plants run more flexibly are likely to cover most of the evening gap. Gas keeps a narrower role as insurance against multi-day shortfalls in wind and solar output.
What is India's compressed biogas blending obligation?
It requires city gas distributors to blend compressed biogas (CBG) into compressed natural gas for vehicles and piped natural gas for homes. The share is 1% in 2025-26, 3% in 2026-27 and 4% in 2027-28, rising to 5% from 2028-29. The government expects it to support around 750 biogas projects. Should India use green hydrogen to generate electricity? Not this decade. Green hydrogen supplied to Indian refineries has cleared at INR 387 to 397 per kg, which makes it a premium industrial feedstock. It is better used to replace fossil hydrogen in fertilizer and refining than burned for power in a market where coal sets the price.
Do data centers in India need onsite power generation?
In most cases, not for speed. Unlike in parts of the US, grid supply in India is generally available and cheap, so onsite generation is mainly about backup and securing round-the-clock renewable supply. That could change in Mumbai, which accounted for 94% of new data center supply in the first half of 2026, if local grid connections become a constraint.
What is the Temporal Trilemma?
The energy trilemma balances security, affordability and sustainability. The Temporal Trilemma adds the missing time axis: how fast the system is changing relative to how fast it can plan and build. It explains why India, adding renewables quickly to a coal-based system, sets different priorities from the US or UK.