PJM Peak Demand Rose 10% in Three Years. One Large Gas Plant Was Built to Meet It.

By Alex Marshall. Thermal Coverage Ratio series, entry 2. Entry 1: ERCOT.

Disclosure: I work for a distributor of gas engines. Gas engines count as dispatchable capacity in this ratio.

The finding

On July 2, 2026, PJM Interconnection (PJM), the grid operator for 67 million people in 13 states and Washington, DC, served a summer peak of 162,648 megawatts (MW). That was 10.2% above the 2023 peak of 147,605 MW. Over the same three summers, gas and coal capacity on its system fell by 2,148 MW. One large gas plant came online in that time: the 900 MW Trumbull Energy Center in Ohio, in April 2026.

Most coverage of July 2 asked whether PJM had broken its all-time record. On measured demand, it had not. The metered peak was 2,915 MW below the 165,563 MW record set in 2006. It stayed below because PJM called on about 6,000 MW of demand response: large customers paid to cut their use for a few hours. Add that back, as PJM's own "unrestricted" figure does, and 2026 is a record.

I think the record is the wrong question - the question I would ask is what share of that peak the system could meet from plants it can start and run on command, whatever the weather. That is the Thermal Coverage Ratio (TCR): the net summer capacity of gas and coal plants, divided by the summer peak. In PJM it fell from 91.1% in 2023 to 81.3% in 2026. The gap between the peak and thermal capacity more than doubled, from 13,209 MW to 30,399 MW.

 

PJM's summer peak rose 15 GW in three years. Gas and coal capacity fell 2 GW.

 
Capacity: US Energy Information Administration (EIA) Form 860M, the month of each year's peak. Peak: EIA Form 930, highest metered hour from June to September. TCR = gas and coal capacity divided by summer peak.
Year Gas (MW) Coal (MW) Gas and coal (MW) Summer peak (MW) Peak date TCR Gap (MW)
201985,07352,251137,324152,315Jul 1990.2%14,991
202086,72949,844136,573145,428Jul 2093.9%8,855
202189,73847,723137,461149,590Aug 2491.9%12,129
202291,44844,236135,684148,528Jul 2091.4%12,844
202395,24239,154134,396147,605Jul 2791.1%13,209
202494,86536,666131,531153,121Jul 1685.9%21,590
202595,01836,269131,287160,560Jun 2381.8%29,273
202696,73135,518132,249162,648Jul 281.3%30,399
 

Capacity: US Energy Information Administration (EIA) Form 860M, the month of each year's peak. Peak: EIA Form 930, highest hour from June to September. Each peak was the hour ending at 5 p.m. or 6 p.m. Eastern time.

Measured from 2019, the picture looks milder. Peak demand rose 6.8% and thermal capacity fell 3.7%. But 2019 was a hot summer, and demand was 3.1% lower in 2023 than in 2019. All of the growth came in the last three summers. That is the period the headline describes.

What was built

From the July 2023 peak to the July 2026 peak, PJM added 915 MW of gas capacity. Trumbull accounts for 900 MW of it. The rest is a handful of units of 1 MW to 3 MW. Over the same period it added 10,520 MW of solar, 1,092 MW of wind and 333 MW of batteries, by EIA's net summer ratings.

The gas build did not slow. It stopped. From 2019 to 2023, PJM added an average of 2,334 MW of gas capacity a year. In 2024 it added 9 MW. In 2025 it added 5 MW. Coal retirements continued throughout: 3,636 MW of coal left the fleet between the 2023 and 2026 peaks. Gas capacity rose 1,488 MW net over that time, more than was built, because some coal units were converted to burn gas.

Nothing large is coming soon. In July 2026, EIA listed 8 MW of gas and coal under construction in PJM. Another 7,034 MW of gas is planned for 2028 and 2029. None of it had started construction.

The new solar mattered on July 2. In the peak hour, 5 p.m. to 6 p.m., EIA-930 shows solar producing 11,477 MW. But PJM's tightest hour for its other plants came later, as the sun set. PJM reports that net load, demand minus wind and solar, was 148,990 MW at the peak and rose to 153,498 MW later that evening. Solar moved the hard hour. It did not remove it.

PJM and ERCOT

PJM's ratio is now below that of the Electric Reliability Council of Texas (ERCOT), the first entry in this series. ERCOT stood at 83.1% at its July 2026 peak. PJM stood at 81.3%.

The two grids got there by different roads. ERCOT's peak grew 22% from 2019 to 2026 while its thermal fleet grew 3%. Texas kept building gas plants, mostly combustion turbines and engines. Demand simply grew faster. PJM's demand was flat for four years and then rose 10% in three. Its thermal fleet shrank throughout, and the gas build stopped just as demand turned.

Two other differences matter. ERCOT has few links to neighboring grids, so a falling ratio there points straight at storage and new plants. PJM is connected to its neighbors, which in principle gives it more room. And ERCOT has built about 19 GW of batteries. PJM has 684 MW. In Texas, storage is part of the answer to the gap. In PJM it is not yet a material one.

The forward ratio

The ratio keeps falling even if demand stops growing. The table below holds the peak at its 2026 level, adds no new plants, and removes only gas and coal units whose owners have filed a deactivation request with PJM. A deactivation request is the formal notice an owner must give before closing a plant.

 
Holds the summer peak at its 2026 level (162,648 MW) and adds no new plants. Removes gas and coal units with a filed PJM deactivation request, by PJM's requested date. Megawatts are EIA net summer ratings. Sources: PJM Generation Deactivations, viewed November 24, 2026; EIA Form 860M, July 2026.
Retirements removed through Units leaving Gas and coal (MW) TCR Gap (MW)
2026Eddystone 3 and 4 (760 MW)131,48980.8%31,159
2027Kincaid 1 and 2, Cumberland, Sherman Avenue (1,286 MW)130,20380.1%32,445
2028Rockport 1 and 2 (2,600 MW)127,60378.5%35,045
2029Cardinal 3 (620 MW)126,98378.1%35,665
2030Cooper 1 (116 MW)126,86778.0%35,781
2031Brandon Shores 1 and 2 (1,273 MW)125,59477.2%37,054

Sources: PJM Generation Deactivations, viewed November 24, 2026; EIA Form 860M, July 2026. Megawatts are EIA net summer ratings.

 

Owners have also told EIA they plan to retire Clinch River (460 MW) in 2030, and gas units at Martins Creek (1,700 MW) and Brunner Island (1,411 MW) in 2035. None has filed with PJM. Including them would take the ratio to 75.0%.

The dates are less firm than they look. Eddystone 3 and 4 were due to retire on May 31, 2025. The US Department of Energy has kept them running since then under a series of 90-day emergency orders, the latest to November 20, 2026. Brandon Shores runs under a reliability-must-run arrangement: it is paid to stay open until transmission upgrades are finished. Both cases make the same point. Plants are being held open because the system cannot yet do without them.

What the ratio does and does not claim

The ratio measures dependence, not adequacy. It is not a reserve margin, and nobody argues that gas and coal should cover 100% of the peak. A grid can run reliably at 81% or at 60%. What changes as the ratio falls is how much of the peak rests on resources whose output depends on the weather, the hour, a customer's agreement to cut use, or how long a battery can discharge.

It counts capacity as reported, not as accredited. PJM's capacity market discounts each resource for its expected outages and its performance in the hours of highest risk, under rules called Effective Load Carrying Capability (ELCC). Gas and coal plants also fail in heat and cold. At the July 1 peak, PJM reported 14,856 MW of generation on outage. The ratio does not net that out. It is a structural measure: what the fleet could do if every plant were available.

It does not say what should fill the gap. A falling ratio describes a widening dependence. It does not prescribe gas, or any other technology.

The strongest objections

PJM has 33 GW of nuclear. This is the strongest objection, and it is true. PJM's 33,492 MW of nuclear plants are firm. Count them, and the firm fleet covered 101.9% of the 2026 peak. I leave nuclear out because it runs at constant output. It does not rise and fall with demand through an evening, which is what the ratio is meant to capture. But counting it does not change the direction. Firm coverage with nuclear was 112.1% in 2019. It fell by 10 points, about as much as the ratio itself.

PJM can import. In principle, yes. On July 2 it did not. At the peak hour, EIA-930 shows PJM's net imports from its neighbors at 8 MW, close to zero. New York and New England peaked on the same day. In 2019, by contrast, PJM was exporting 3,107 MW at its peak hour. In a regional heat wave, the neighbors need their own plants.

Demand response covered the gap. It covered part of it, and it is real capacity. PJM pays for it through its capacity market. But it is bought for a limited number of hours and calls. The test is a heat wave that runs for days, not one evening. On PJM's unrestricted peak, which adds demand response back, the 2026 ratio is 79.7%.

Batteries will fill it. Not in PJM yet. In July 2026 it had 684 MW of battery storage with an average duration of 2.2 hours. The 2026 gap was 30,399 MW.

The capacity market will fix it. The market is sending the signal. The auctions for 2027/2028 and 2028/2029 both cleared at their price caps, $333.44 and $325 per megawatt-day. Both fell short of PJM's reliability requirement, the first time this has happened across the whole footprint. The 2028/2029 auction fell 6,831 MW short and cleared 525 MW of new generation and uprates. A strong price is not yet producing new plants at the pace demand is growing. Some argue the caps themselves weaken the signal. Either way, the supply response is not visible in the data.

Announced retirements are often withdrawn. True, and more so now. On July 2, 2026, the day of the peak, owners withdrew deactivation requests for 36 units in Illinois, 4,391 MW in total. From 2024 through October 2026, owners withdrew 5,479 MW of gas and coal deactivation requests and completed 1,722 MW. That cuts both ways. The forward ratio may hold up better than the table shows. But it would hold up because old plants stay open, not because new ones arrive.

What it means for flat loads

Data centers draw close to the same power at 6 p.m. as at noon. Each new megawatt of that demand in PJM now rests a little more on resources that are available for some hours and not others: solar before sunset, demand response for its contracted hours, batteries for their duration, imports when the neighbors have spare power. It also rests on old plants kept open by emergency orders and reliability arrangements.

The ratio does not say how to close the gap. The options are known: more transmission and import capacity, storage with longer duration, demand that can flex at the evening peak, including from data centers themselves, and generation built at or near the site. Each has a cost and a lead time. The question for anyone siting a large load in PJM is which of these they are relying on, and for which hours.

Method

  • Series unit. The balancing authority: the organization that matches supply and demand on a grid in real time. PJM is one balancing authority, so the series treats it as one market, as it did ERCOT.

  • Capacity. EIA Form 860M, the monthly inventory of operating generators, for the month of each year's summer peak. Balancing authority code PJM. Net summer capacity as reported: what a plant can deliver in summer conditions after its own internal use.

  • Thermal. Gas and coal, by each unit's primary fuel as reported in that month's file. All operating statuses are counted, including standby and out of service, as for ERCOT. Removing units listed as out of service lowers the 2026 ratio from 81.3% to 81.0%.

  • Peak. The highest metered hourly demand from June to September in EIA Form 930, as for ERCOT. For PJM, EIA-930 is used because PJM's own hourly metered data cannot be redistributed under its terms. For ERCOT, EIA-930 gives 91.1 GW for 2026, matching the 91,134 MW in entry 1. EIA-930 contains erroneous hours in summer 2020; hours more than 20% away from EIA's own demand forecast were dropped. Every peak hour matches the date and hour of PJM's own published peak.

  • Footprint. Unchanged from 2019 to 2026. The last integration was the Ohio Valley Electric Corporation (OVEC) in December 2018. EIA still coded OVEC's two coal plants (2,136 MW) to OVEC in its 2019 to 2021 files; they are counted as PJM.

  • Winter. PJM's annual peak fell in summer in every year from 2019 to 2026. The highest winter peak in the period was 144,420 MW, in January 2025.

  • Not counted. Nuclear, hydro, oil, wind, solar, storage, biomass, imports and demand response. The broad variant, which adds oil, other gases and biomass, gives 85.7% for 2026, down from 96.4% in 2019. PJM has 4,959 MW of oil-fired capacity, and about a quarter of its gas capacity can switch to oil. Oil-fired generation was 6,194 MW in the 2026 peak hour, up from 1,054 MW in 2019.

Data and sources

The workbook lists every unit behind every number, with formulas for each ratio: PJM Thermal Coverage Ratio, 2019 to 2026 (.xlsx). Published under a Creative Commons Attribution 4.0 (CC BY 4.0) license: reuse it with attribution.

 

Five Nines and Fast Power

Power Strategy for Data Centers, AI Infrastructure, and Digital Investments

 
 

Questions and answers

What is the Thermal Coverage Ratio?

It is the share of a grid's summer peak demand that gas and coal plants could meet on their own. It divides the net summer capacity of those plants by the summer peak, both in megawatts (MW). It measures how much of the peak rests on plants that can be started and run on command, whatever the weather.

What was PJM's Thermal Coverage Ratio in 2026?

81.3%. Gas and coal capacity was 132,249 MW against a metered summer peak of 162,648 MW on July 2, 2026. The gap between the two was 30,399 MW. In 2023 the ratio was 91.1% and the gap was 13,209 MW.

Did PJM set a new peak demand record in 2026?

Not on measured demand. The metered peak of 162,648 MW was 2,915 MW below PJM's record of 165,563 MW, set in 2006. PJM's "unrestricted" figure, which adds back about 6,000 MW of demand response called that day, was 165,910 MW, which is above the record.

How much new gas capacity did PJM add between 2023 and 2026?

915 MW, of which 900 MW is one plant: the Trumbull Energy Center in Ohio, online in April 2026. From 2019 to 2023, PJM added an average of 2,334 MW of gas capacity a year. In 2024 and 2025 combined it added 14 MW.

Why does the ratio leave out nuclear power?

Nuclear plants are firm, but they run at constant output. They do not rise and fall with demand through an evening, which is what the ratio is meant to capture. Including PJM's 33,492 MW of nuclear would put 2026 coverage at 101.9%, down from 112.1% in 2019.

Why does it leave out solar, wind and batteries?

Their output depends on the weather, the hour, or how long a battery can discharge. Solar produced 11,477 MW at PJM's 2026 peak hour, but its output falls as the sun sets, and PJM's highest net load came later that evening. PJM had 684 MW of battery storage in July 2026.

Does a falling ratio mean PJM's grid is unreliable?

No. The ratio is not a reserve margin, and no one argues gas and coal should cover 100% of the peak. A falling ratio means more of the peak depends on resources that are available for some hours and not others, such as solar, demand response, batteries and imports.

How does PJM compare with ERCOT?

PJM's 2026 ratio of 81.3% is below that of the Electric Reliability Council of Texas (ERCOT), which was 83.1%. ERCOT kept building gas plants but demand grew faster. In PJM, demand was flat until 2023 and then rose 10% in three years, while gas and coal capacity shrank.

What happens if announced retirements go ahead?

With gas and coal units that have filed deactivation requests with PJM removed, and the peak held at its 2026 level, the ratio falls to 77.2% by 2031. Adding retirements that owners have reported to the US Energy Information Administration (EIA) but not filed with PJM takes it to 75.0%.

Where does the data come from?

Capacity comes from EIA Form 860M, the monthly inventory of operating generators, for the month of each year's summer peak. Peak demand comes from EIA Form 930, the hourly demand PJM reports to EIA. Retirement dates come from PJM's list of generation deactivations.

Can I reuse the data?

Yes. The workbook is published under a Creative Commons Attribution 4.0 (CC BY 4.0) license. You can copy, adapt and share it, including for commercial use, as long as you credit Alex Marshall, link to the license and say if you changed it.

Who produced this analysis?

Alex Marshall developed the Thermal Coverage Ratio and built this analysis from public data. He works for a distributor of gas engines, which count as dispatchable capacity in this ratio.